ROPP MACHINE SAFETY AND HANDOVER CHECKLIST — BLANK PROJECT RECORD This is a project-planning aid, not a risk assessment, conformity declaration or substitute for the supplied instructions. Complete it for the actual machine, connected line and site with competent people. 1. MACHINE AND PROJECT BOUNDARY [ ] Machine model, serial number and supplied equipment recorded [ ] Intended use, formats, products and foreseeable misuse reviewed [ ] Cap feeder, conveyors, inspection, reject and adjacent equipment boundaries identified [ ] Modifications and site-supplied work identified 2. RISK AND SAFEGUARD REVIEW [ ] Current machinery risk assessment status recorded [ ] Dangerous movements, trapping, crushing, drawing-in and ejection hazards reviewed [ ] Cap and bottle transfer, feeder, turret/head and conveyor hazards reviewed [ ] Guarding/protective devices and access openings reviewed [ ] Safety functions, stopping and restart prevention validated as applicable [ ] Residual risks, markings and information recorded 3. OPERATING MODES AND ACCESS [ ] Normal production mode and operator position confirmed [ ] Cap replenishment and bottle handling method confirmed [ ] Changeover/setup access and authorisation confirmed [ ] Jam-clearance method confirmed [ ] Cleaning method confirmed [ ] Maintenance and diagnostic access confirmed 4. ENERGY ISOLATION [ ] Electrical isolation identified [ ] Pneumatic/other energy isolation identified [ ] Stored energy dissipation and verification method identified [ ] Lock-off and return-to-service method identified 5. INTEGRATION AND INSTALLATION [ ] Final layout, access and delivery/installation route approved [ ] Guard openings and transfer points to adjacent equipment closed [ ] Emergency-stop and line-control boundaries documented [ ] Remote start, fault, reset and affected-bottle behaviour tested [ ] Site-specific risk review completed 6. DOCUMENTS, TRAINING AND HANDOVER [ ] Applicable declaration, markings and instructions received [ ] Drawings, parts lists, maintenance and safeguard checks received [ ] Operator and maintainer training completed and recorded [ ] Open actions have owners and due dates [ ] Authorised acceptance and release to production recorded Project: Machine/serial: Site: Completed by: Date: Open actions: